On
Approvals?
Yes
Interface Change
Changed both Document Header (Type D) and Document Line (Type L) records as follows:
- Document Type (Columns 3-6)
- R/O - Changed to: Optional
- Description - Changed to: Enter document type or leave blank.
- Field Value - Changed to: PZ, Space
- Agency Code (Columns 7-10)
- R/O - Changed to: Optional
- Description - Changed to: Enter agency code of submitting agency or leave blank.
- Field Value - Changed to: Removed contents
- Batch Number (Columns 11-16)
- R/O - Changed to: Required
- Description - Changed to: Leave blank.
- Field Value - Changed to: Spaces
Changed both Document Header (Type D) and Document Line (Type L) records as follows:
- Document Type (Columns 3-6)
- R/O - Changed to: Optional
- Description - Changed to: Enter document type or leave blank.
- Field Value - Changed to: PZ, Space
- Agency Code (Columns 7-10)
- R/O - Changed to: Optional
- Description - Changed to: Enter agency code of submitting agency or leave blank.
- Field Value - Changed to: Removed contents
- Batch Number (Columns 11-16)
- R/O - Changed to: Required
- Description - Changed to: Leave blank.
- Field Value - Changed to: Spaces
The Project Participation (PZ) Interface layout was not affected by Financial Release 2.2
Other Changes
On the document line record the last three fields were not in the correct order. The correct order is: Def/Orig/Adj, Obligation Program, Obligation Program Split.
Date